The Little Boltons | Bringing It Together
The project moves into its final stages, with each floor now settling into its finished form.
Across the upper levels, joinery, ironmongery, and finishes are in place, with bathrooms completed and services commissioned. What was once structure is now reading as a series of resolved, considered spaces.
Below, kitchen installation, plant, and services continue alongside final decoration and stair detailing. Outside, the garden and terrace are taking shape, adding another layer to how the house will be experienced.
This is where everything aligns — not just built, but brought together with intent.
Construction by
@ubercontracts
Interior Design by
@gordondufflinton
Architecture by
@dyergrimes_architecture
QS by
@eleyquantitysurveying
Engineering by
@zussmanbear
#TheLittleBoltons #UberContracts #PrimeResidential #CraftsmanshipMatters #ConsideredConstruction BehindTheBuild BespokeHomes HighEndConstruction PrecisionInProgress