Layden

@laydenprojects

Architectural Builders Sydney | SE Qld
Followers
2,021
Following
926
Account Insight
Score
28.29%
Index
Health Rate
%
Users Ratio
2:1
Weeks posts
The staircase from a CLT home designed by Luigi Rosselli. The details handled with care, making sure the execution matches the design.
39 0
14 days ago
Making progress at Bellevue Hill. Not much to look at yet but the view is doing a lot of heavy lifting. Architecture @luigirosselliarchitects
57 1
16 days ago
Roof pour completed in the first week of january for a multigenerational home. The roof pour was a total of 980m3 of concrete. Great effort from our Queensland team.
195 10
23 days ago
Arches from a restoration in Double Bay. It's an older home with some great original details and the arches were definitely worth keeping. @hancockarchitects
37 1
26 days ago
What a project. Exciting times and exciting challenge on Tamarama headland. Architecture @luigirosselliarchitects Engineering @partridge_engineers Interiors @handelsmannkhaw Render @stabstudio
235 6
27 days ago
Outdoor features from our job in Darling Point, a brand new build by architect Polly Harbison.
59 2
1 month ago
A heritage renovation in Bellevue Hill with @luigirosselliarchitects & @handelsmannkhaw . Framed and working through the finishes.
66 0
1 month ago
First cover for @greenmagazine . Such an enjoyable project and great result for @luigirosselliarchitects The speed of this construction is exhilirating and satisfying for the organised buider. Hopefully not too much longer until the next one.
44 0
2 months ago
Reconfiguration of a paddington warehouse into one of the best set of kids cupboards we have done to date. Architect: @alexander_andco PM: @brooklane_
33 0
5 months ago
174 16
5 months ago
Greenoaks Manor was rebuilt to exact levels and a consistent datum, a precise process made more challenging by aligning with the original brick façade. Architecture: @hancockarchitects PM: @brooklane_
48 0
6 months ago
A large multi-generational home in the gold coast hinterland. We are doing the largest pours possible to facilitate some large cantilevers and minimise joins. This recent pour for half of level 1 totaled 738m3. This project is being run by our permanent SE Qld site team. Architect: @joesnelldesign Engineer: @edgeengineers Services: @jn_consultingengineers Landscape: @nestlandscapedesign Builder: @laydenprojects
284 12
8 months ago