Jointly Day 2025 - Marking another year over.
We couldn’t have a better group.
Thanks to anyone that featured in our year and enjoy the summer break!
Photos: @jameshenryphotos
A shoutout to every regional town that has welcomed us, every regional trade & supplier that has worked with us, our metro based staff who have spent long hours in the car and the biggest thanks to our regional based employees who work tirelessly to deliver our projects with passion.
This is a milestone we couldn’t be more proud of.
Fibre Optic Symphonic Orchestra in Wentworth is now open.
We couldn’t be prouder to have been apart of this project.
Words from Bruce Munro;
‘This has been a mammoth 5 year project and we can’t wait for all to experience it.
Imagine 80 illuminated Hills-Hoists, each one a musician.
Together, they perform a beautiful composition by Nainita Desai — a symphony of light and sound you can walk right into.
This is the second installation in the series, following Trail of Light on Lock Island in Mildura. Now FOSO brings the magic to the meeting point of the Darling and Murray Rivers — one of Australia’s most iconic natural confluences.’
Do yourself a favour and go check it out!
Design: Bruce Munro @brucemunrostudio
Videographer: Mike Fletcher @mikefletcher_
Architectural Design: @aspire_architecture@milduracom@experiencewentworth@visitthemurray
FOSO – Before the lights turned on.
The final hours on site before the Bruce Munro designed light installation was turned on.
It was a pleasure to work with and deliver this special project for Wentworth Shire Council.
A huge thanks to everyone who played a part in bringing this to life.
Architectural Design: @aspire_architecture
Light Installation Design: Bruce Munro @brucemunrostudio@milduracom@visitthemurray@experiencewentworth
Project Complete: Sacred Heart Primary School – Mildura
The project involved the extension and full renovation of a number of buildings at the school.
Cutting edge design by the team at @energyarchitects
Photos: Ad Media
Kia - Nissan - Dandenong
Recently completed. The project encompassed the full internal renovation and expansion of both dealerships.
Design: @_spacesdesigngroup
Photos: @jameshenryphotos
St Margaret’s Berwick Grammar Library
A restoration and adaptive reimagining of a late 70s educational wing, the Contemporary Library transforms five compartmentalized rooms into a singular, university-style hub. This renovation of responds to the site’s heritage, stitching a modern “Curiosity Centre” into the existing brick fabric with a balance of technical acoustic rigor and architectural whimsy. Thanks for supporting alumni @smbg_official
WOWOWA Team @zoediac@chanfoni
Built by @jointly_built
Photographed by @gemmola
To start the year we are currently looking to fill a few positions:
- Site Supervisors (Metro and Geelong/Colac region)
- HSEQ Manager or Officer
- Project Manager
If you are keen please contact [email protected]