WolfeWorks Remodeling

@wolfeworksva

Remodeling business in Richmond, VA. Licensed and Insured Class A Contractor
Followers
294
Following
46
Account Insight
Score
20.7%
Index
Health Rate
%
Users Ratio
6:1
Weeks posts
Railing is installed. Up next is to finish the column wraps and all the fascia boards.
17 1
3 days ago
After a colossal product failure by @deckorators we had to rip out all the decking and reframe the deck to account for a 1/4” slope every foot that is required for this @timbertech material to ensure drainage.
45 1
8 days ago
We are hiring! Looking for experienced individuals.
22 0
1 month ago
Bullnose steps and deck skirting are in. Attacking the columns and ceiling next.
25 1
1 month ago
Getting it framed up and the fascia board in. Still have the failing columns to address and ceiling to install.
15 1
1 month ago
Yeah I’d say that’s definitely the problem! But we got it fixed! More to come! We’re just getting started on this porch roof.
17 2
1 month ago
Crowded house! Decking installation and bullnose steps happening at the same time. #scratchmyheadandrubmybellyatsametime
16 1
1 month ago
What a beautiful day for demo! We’re helping this 2 story deck with updated ledger and column support. Then we’ll be reframing the first floor for tongue and groove @deckorators decking.
19 0
1 month ago
This teardown and rebuild is finally done. Finished off the electrical and bead board ceiling yesterday. Once the weather warms up we’ll be able to caulk and apply the top coat of paint.
131 7
3 months ago
Was a COLD ONE! but I was able to get the downspout and the 2nd floor properly secured for the incoming storm. Just need a day to install the handrail and balusters and the bead board ceiling on the 1st floor and this will be done!
31 0
3 months ago
20 0
3 months ago
Trex RainEscape bladder system uses a network of troughs and gutters to divert water from the 2nd story deck Shields the area below the deck from rain, snow, sun, and other elements.
51 1
4 months ago