3 stations/ 6 platforms @ 250m length each.
All cross hatching, continuous yellow line & coping stone white line repainted! Big weekend for the spray crews 🔥
#Lining #Spray #Herfordshire #London #TrainStation
One of many jobs completed this week, the crews have been working days and nights all over the country, from Newquay to Leeds, Southend, Milton Keynes, Gatwick airport.. Another great week from all of the team!
A nice local one at Heathrow airport to finish the week off, we had the existing lines hydro-blasted Wednesday night and then applied the new layout last night, top quality only!
#TGS #ThirdGenServices #Linepainting #Heathrow #London Graco
Phase 1 of this underground car park complete in Dagenham Green, 8 arrows, 16 disabled and 12 normal bays in paint ready to be handed over!! #TGS #carparklinemarking #linepainting #paint #graco
4 jobs completed in Basingstoke and Farnborough yesterday, this consisted of a new car park layout to include green EV bays as well as primrose lines as well as a car park refresh along with 2 other refresh jobs in primrose. Any job, any colour we have it covered in all hot & cold applied materials.
#Primrose #Green #Thermoplastic #Basingstoke #Farnborough
Completion photos and before’s to show the terrible workmanship carried out by another contractor for a job in Basingstoke. We jet washed and removed the markings as best as possible, applied an MMA primer followed by an MMA surface treatment and thermoplastic lines! #YeehawLining #Basingstoke #MMA #Thermoplastic
Over 200m2 of red high friction surfacing & thermoplastic line painting completed for a valued client on a last minute job just in time before their permit ran out, luckily we managed to get this complete at night ready for the road to reopen the following morning.
#HighFrictionSurfacing #LinePainting #RoadMarkings #Lining #Thermoplastic
Phase 1 completed at a new EV site in Leeds, as always the finish was absolutely spot on. Blue and white is the one 🔵⚪️
MMA surface treatment for the blue ✅
Thermoplastic for bays/ markings ✅
Preformed thermoplastic for the numbering ✅
One pack epoxy for the stencil work ✅
Some before and after photos of some work we recently carried out at Southampton Football club where we were tasked to removal the existing accessible bays and replace with 30 bays in orange and “LEVEL 1” in each bay.
#Paint #Orange #Lines #Southampton #Football
Spray applied MMA markings installed at multi storey car park 7 (North terminal) - 61 bays marked with “HOTEL” and a continuous line between the wording as well as “STOP” written at all junctions on the ground floor.
#MMA #Lining #Graco #Paint #London #Gatwick #Airport #Hilton