All boots were on deck in Strathmore 👷♂️
The whole DMAC crew was on site for a major job with Structure 360 and Lurada, powering through piling and drilling while Starbuck leads the bulk excavation.
From the rigs to the rock – it’s always full throttle when we prep ground for structures.
📍Strathmore
🛠️ Bulk dig by Starbuck
🚧 Drilling & piling by the DMAC crew
Drill. Pile. Repeat. DMAC.
#DMAC #StrathmoreProject #CivilConstruction #PilingWorks #DrillingExperts #ConstructionLife #SiteCrew #OnSiteNow #MelbourneConstruction #PilingContractor #ExcavationWorks #GroundWorks #BulkExcavation #HeavyMachinery #Structure360 #IuradaProjects #ConcreteFoundation #EarthRetention #DrillAndPile #BuildingTheFuture #RockDrilling #EngineeringSupport #CommercialConstruction #ProjectDelivery #ConstructionVictoria #GroundEngineering
Lift over run formed and ready for concrete at our toorak project for @iuradapg
.
#formwork #reo #concrete #structure #basement #footings #excavation #melbourne #toorak #construction
Capping beam tied in a day for @kingstonplanthire
#melbourne #construction #structure #360 #retention #retaining #cappingbeam #steelfixing #concrete #shotcrete
Moorabbin.
Great effort by the team to put up this 1000m2 transfer slab all within a week.
Concrete thicknesses from 200 up to 695mm thick.
.
#melbourne #moorabbin #construction #structure #formwork #suspendedslab #transferslab
@buildkomm
The very last piece of concrete to complete our camberwell project for @iuradapg .
Thankyou to @dirtworx_pty_ltd for removing the old footpath and crossover and @alphacreteconcreting for the helping hand getting it done 👍👍
.
#melbourne #camberwell #construction #structure #completed #concrete #formwork #reo #footpath #crossover