Recently completed this Crash wall foundation project in Grimsby. Consisted of 16- 36” caissons 8 meters deep. Rocky ground conditions mixed with a high water table made it quite the challenge but the guys absolutely crushed this. Only 1 chance to get this bang on and they did just that! #caissons #drilling #geax
This past fall we preformed Load testing of our helical piles to make sure they had the capacity to support this beautiful custom home coming soon in Hoggs Hollow. Thanks to our friends @hcmatconinc@rwhengineeringinc for the technical support.
#helicalpiles #loadtest #customhome #toronto
This sports court is the main feature on this Princess Margaret prize home, almost didn’t happen because of the aggressive water table. The boys pushed through sloppy, wet and greasy conditions and got it sealed up and fully excavated ready for immediate mud slab pour. MISSION COMPLETE #dreamteam #shoring #groundwater #princemargaret @calibreconcrete
Tag teaming this deep sports court with a very aggressive water table. Boys are getting it done! Excavating for lagging and loading out to keep space on site. #shoring #groundwater #mississauga #princessmargaret
Laneway suites are a challenge. Organization is key to get the job done. Tight access and even tighter drilling quarters. The guys are crushing this one. #downtowntoronto #lanewaysuite #tightaccess #caissons #shoring #geax
We recently completed this tight access project in the heart of Downtown Toronto. Shoring, removal of contaminated fill, assisted with the install of services and the best part working around live gas X3. The guys crushed this one! #geax #shoring #dreamteam
1 truck concrete 1 truck ufill, trying to make up for lost time as the month of February laid the smack down! #shoring #drilling #geax #dreamteam #toronto
Splicing 40ft piles on this job due to the low headroom with high voltage power lines above. The guys are pushing through the cold weather and snowy conditions to get the job done for our friends at @hcmatconinc #geax #shoring #caissons #perfectfit
Down to final grade (-17ft) on this crazy wine cellar addition. With tight access and a lot of steel work to protect the 2 upper balconies this one was for sure a challenge but the guys crushed it. Thanks to @bradley_demolition_excavation on making this go as smooth as possible! #winecellar #dreamteam #toronto #shoring #tightaccess
Piles are in and starting the cut down for the welding crew to come in and work their magic. Walers, corner-braces, struts, and scaffolding support to come for this 20ft deep underground wine cellar! #tightspaces #downtowntoronto #shoring #geax #dreamteam