Finally finished making a couple of carts for organizing smaller chunks of fabrication steel.
First project on my new fixture table. I’m finally not building stuff bent over on the uneven concrete or on to small of a table.
Pulled the 5 ring. Added angle iron under the gates where I could to add support. Added the corner armor to the new grooved gates. @atek_fpv installed the LED. I siliconed everything and we reinstalled today. Looks so much better. The light looks better. The gates look tough! I think we finally got this down by V3…. We’ll see if there is a V4…. lol
New obstacle in the works. 10’ cube diamond gate. 20’ 4x6’s on the cross. 10’ 4x4’s connecting each side of the diamond. Gunna dado in a groove in all boards to run the LEDs in and then fill with silicone like we did on the uneven bars. Should be about 25’ tall to the tip of the diamond.
🪚 Handcrafted by @atek_fpv his routed LED’s are the way. 💡 @sackhoff giving it the inspection.
This feature section of the park is called the uneven bars and has a perfect tube lined up to slam dunk your drone!
#fpv #fpvfreestyle #fpvdrone #fpvpark #fpvdrone #fpvlife
🪚If you build it they will come!🛸
@sackhoff the mastermind behind the North West FPV Park! One of the coolest dudes you’ll ever meet!
#fpvfreestyle #fpv #fpvdrone #fpvpark