Day 7 of the move and we’re getting closer.
The mill and bandsaw are both in place and ready to be powered up. The cold saw is set and now we’re building a roller table to support material while cutting. The press brake is in, powered up, and running great — just needs the outside rigger arms installed.
The laser is finally in place too… she definitely needs a spa day after this move, but we’ll get her cleaned up and dialed in soon. The Dragon is up and running, the foreman station is in place, and the weld stations are starting to look like home.
One thing we highlighted in the video is the dust and fumes our collectors pull out of the air. Those systems are a critical part of our operation and keeping our guys healthy is a top priority.
Tomorrow we officially begin limited production at the new shop in Coal Township. Thanks for following along through this crazy process — more updates coming soon.
#CeccoMotorsports #CeccoRacing #ShopMove #FabricationShop #MadeInUSA OffRoadFabrication CoalTownship MetalFab RaceProven
Friday update from the big move to Coal Township. The laser is getting reconnected and assembled, and the majority of the equipment is now in place. We still have power hookups left for the press brake, bandsaw, mill, and lathes, but things are really starting to come together.
The weld shop area is shaping up great. Kolby, Q, and Cameron have been working hard organizing material flow, parts sorting, work areas, and equipment placement to create a much more efficient workflow. The goal is simple — increase capacity while keeping the quality and craftsmanship that we’ve built our name on.
Right now it’s still a little bit of this and that scattered everywhere, but every day gets us closer. More updates coming soon as we keep progressing.
#CeccoMotorsports #CeccoEnterprises #CoalTownship #FabricationShop #MadeInUSA OffRoadFabrication Manufacturing MetalFabrication ShopMove Welding CNC LaserCutting BuiltNotBought
Big day for the move. Zartman Construction picked our 8,800 lb laser up and over the garage like it was nothing. Pretty wild to watch the planning, equipment, and skill it takes to move machinery like this safely and efficiently.
Huge thanks to their crew for making it happen. Next stop: unloading and setting it into our new facility in Coal Township. Exciting times ahead for Cecco Enterprises.
#ShopMove #HeavyEquipment #Rigging #FabricationShop #CeccoEnterprises CoalTownship Manufacturing LaserCutting BigMoves
Thursday is the big day. The move is in full swing at our new Coal Township facility. The crew from Zartman Construction is here handling the heavy lifting and already has the press brake rigged up and getting loaded onto the flatbed. There’s a massive 130-ton crane on site while another crew is working to get the laser pushed outside so it can be lifted up and over the building.
We had to sneak away this morning to launch another rental at the AOAA, so we’re probably going to miss seeing the laser make its trip up and over the building onto the trailer… definitely something we were looking forward to seeing in person.
Either way, it’s exciting to see this all finally happening. We’ll keep everyone updated throughout the day as more equipment makes the move to Coal Township. Have a great Thursday, guys.
#ShopMove #CoalTownship #CeccoMotorsports #CeccoEnterprises #FabricationShop MadeInPA Manufacturing LaserCutting PressBrake AOAA MovingDay
Day 3 of the move to Coal Township. Doing a walkthrough of the new facility today and showing some of the progress we’ve made so far.
In this video I show the brand new insulated walls and metal liner panels throughout the fab shop along with where the weld stations are going to be set up. Every fabricator will have their own work area and garage bay door. I also show where the laser is getting placed along with the shipping & receiving area where we still have product in stock and orders continuing to move during the transition.
One of the coolest parts jof this project is how we insulated the old building. We installed replacement windows on the inside while leaving the original metal building windows in place to help make the shop more energy efficient. We also poured a new concrete pad outside for the 10-ton HVAC unit that’ll keep the building comfortable year-round.
Today was supposed to be equipment moving day, but the rain pushed the riggers back until tomorrow. Tomorrow should be a big day with the laser, press brake, and more heavy equipment making the move into the new home.
#CeccoMotorsports #CeccoEnterprises #CoalTownship #FabricationShop #MetalFabrication
Day 2 – Shop Move Update 🚧
Day two of the big move from Elysburg to Coal Township and the guys have been getting after it.
We’ve been busy breaking down the BenTech Dragon, moving cantilever racking out of the tube shop, and getting all the weld tables out. Bandsaw, press brake, and more heavy equipment are staged and ready. The riggers showed up and already have the laser positioned to head out the door tomorrow.
We also started reassembling the Dragon at the new facility — we’ll grab some video of that later today.
Tomorrow is a big one. Crane day. The laser and press brake are getting picked, and everything else — bandsaw, mill, dust collector, and remaining heavy pieces — will be moved in.
We’re making serious progress and well on our way. Stay tuned 👊
Big week for us.
We’re officially moving from Elysburg to our new shop in Coal Township — and it’s happening right now.
All weekend we’ve been hauling in the inventory we stockpiled for this move. Through the transition, we expect to keep up with about 90% of orders like we always do. Equipment will take about a week to move, and production should be fully back to normal within two weeks.
This new facility is double the size of what we’re leaving… which means more capacity, better efficiency, and even faster lead times (which already beat industry standards).
Wednesday is the big day — crane is coming in to move the heavy hitters: laser, press brake, and manual machines. Everything else? We’re handling it ourselves — welders, tables, benders, fixtures, shelving… the whole operation.
Stay tuned this week — we’ll be sharing progress, videos, and behind-the-scenes as it all comes together.
Built for our rental fleet, these new RMAX4 steps help protect the lower body of the machine and give customers an easier step in and out. Practical, tough, and purpose-built. Coming soon to our website.
“THE 1” MX Bumper has landed.
We took our proven PHAT bumper profile….put it on a serious diet…
• 1” tubing = lighter, faster, race-ready
• Lightened tabs + added gussets = strength where it counts
• Half number plate = clean MX/XC look
Whether you’re lining up on the gate, chasing points in the woods,
or just ripping trails on the weekend—this bumper is built to take it.
Same Cecco toughness. Just leaner. Meaner. Faster.
MX racers. XC racers. Trail riders. This one’s for YOU.
Built in Central PA 🇺🇸
#CeccoMotorsports #The1 #MXBumper #XCRacing #ATVRacing TrailReady MadeInUSA BuiltNotBought
Cannondale guys — we finally did it.
We built a true bullhorn front bumper made specifically for Cannondale ATVs.
Not cut down, not “made to fit” from something else… this is the real deal.
Built right here in PA — 100% aluminum, cut, formed, and welded in-house.
We’ve got 10 total going up on the website this afternoon.
We’re holding shipping until all 10 are sold — then they go out.
$189.95 bare
$209.95 powder coat
If you’ve been looking for a legit Cannondale bumper, this is it.
👉
Our 2025–2026 Outlander 700 Bulldozer Front Bumper is laser cut, formed, and welded right here in Central Pennsylvania at Cecco Motorsports.
4-point chassis mounting for maximum strength.
Full winch & fairlead clearance.
Race-ready durability with everyday versatility.
Charge it through the woods.
Line up at GNCC.
Plow snow.
Run your winch.
Trail ride all weekend.
Starting at $249.95
One bumper. No compromises.
#CeccoMotorsports #Outlander700 #ATVLife #GNCC #XCRacing
📦 Shipping Update 📦
We spent Christmas Eve hustling to keep orders moving and set everyone up strong for the New Year.
Didn’t realize until late that UPS was drop-off only today — no pickups.
If you received a tracking number, your order is packed and ready, it just won’t start moving for a couple days.
Huge thanks to everyone keeping us busy right into the holidays. One more week to go and the momentum is unreal — let’s keep it rolling into the New Year 💪
#CeccoMotorsports #SmallBusinessGrind #ChristmasEveWork #NewYearMomentum #OffRoadLife FabricationLife OrdersPacked