Campervan Capers “The Return”
I can see the finishing line on the horizon!!!!!
The Campervan Furniture Ltd kit is all in and looking great.
Setting out the sink and tap location on the worktop, it’ll be under mounted and there will be a circular wooden insert.
Fridge wired up and working.
SavvyVan touchscreen control surface is in place on the overhead locker end.
Campervan Capers “The Return”
A nice wee delivery today for the van, a bit early but they will go into storage until it’s ready to roll.
Load rated to 5000kg and sporting some lovely all terrain tyres.
We should manage to get out of a muddy Belladrum Tartan Heart Festival field with no issues.
Campervan Capers “the return”
Sunday update!!!!
Continued with the electrics/water build, got all the 240v side done as far as I can at the moment.
Got the board sitting roughly in place to make sure it’s all good. It will get permanently fixed once the furniture kit is installed.
Furniture kit is being started Monday so it should be ready to ship at the end of next week 🤞.
It’s all go in Campervan HQ, need to get it ready for the spring.
Campervan Capers “the return”
Some more progress today
IKEA bed beams fitted, they are on brackets at each end so when you open the back doors there is a nice big open storage area under the bed.
Started the water and electrics build, this is all mounted to a board which will sit below the bed towards the front.
Campervan Capers “the return”
Christmas Day (Camper Style)!!!!
Shurflo Water pump, filter and accumulator.
Eberspacher E-Tronic electric air heater.
Propex 6 litre electric water heater.
Alpicool 12v 65 litre campervan compressor fridge.
Campervan Capers “the return”
Some more progress from the weekend.
Wall boards fitted.
Kitchen area socket fitted.
Toilet flush button installed.
Roof slat panels test fitted, removed for insulating the voids then fully fitted.