Wrench 🔧 work. 500 DI install with a couple hymax couplers.. slick units but a whole lot of wrenching. #workingforthemann #civilconstruction #victoriabc #pipelayer
91 33
10 months ago
Big boulder in a bad spot 👀 🪨 #workingforthemann #civilconstruction #hitachiexcavator #excavator
679 65
1 year ago
Old school crew. New school vibe. 😎 Do you recognize the movie 🎥 this mock is from? Name it blow ⬇️ #workingforthemann #civilconstruction
163 17
1 year ago
Colquitz Creek Bridge | Highway 1 Upgrades 🚧 Crews are back on site at the Colquitz Creek Bridge project as work continues on this major Highway 1 upgrade through Victoria. The project is focused on improving traffic flow, strengthening the corridor, and helping create a smoother commute for drivers travelling through the area every day. It’s also great seeing the environmental side of the project moving forward with upgrades designed to help protect the surrounding creek and habitat long term. Another solid collaboration working alongside Pomerleau as progress continues.
18 2
2 days ago
450 Dallas | Civil Works 🚧 Our crews are on site at 450 Dallas continuing civil work alongside @aryzedevelopments Today’s scope focused on preparing the site for a hydro vault/junction box installation, with @viccitycrane bringing in a mobile crane to help safely lift and position the precast box into place. These underground vaults play an important role in housing and protecting electrical infrastructure while helping keep services organized and accessible as the project moves forward.
27 2
3 days ago
Colquitz Creek Bridge | Back on Site 🚧 Our crews are back working at the Colquitz Creek Bridge project as improvements continue along this important section of Highway 1 in Victoria. The project will help improve traffic flow, strengthen the existing bridges, and create a more reliable connection for commuters travelling through the corridor each day. Along with the infrastructure upgrades, the project also includes environmental improvements focused on protecting the surrounding Colquitz River habitat and improving water quality in the area. Proud to be part of another important infrastructure project alongside Pomerleau helping support the future of transportation on Vancouver Island.
49 3
5 days ago
450 Dallas | Heavy Lift Day 🏗️ Big move on site today at 450 Dallas as crews prepared for the installation of a new hydro vault alongside @aryzedevelopments With support from @viccitycrane , the precast junction box was carefully lifted and set into place as underground servicing work continues to move forward. These vaults help support and protect critical electrical infrastructure below grade while keeping future access efficient for servicing and connections. Always cool seeing the coordination that goes into these larger lifts on tight urban sites.
40 6
6 days ago
Royal Bay | Underground Work Underway Our crew is on site at Royal Bay, running services from each lot back to the mainline along the road. It’s a detail-driven process. From setting grades right, layering and compacting as we go. We’re making sure everything is solid below the surface before the next phase moves ahead.
37 6
9 days ago
Coordinating the Utilities 📝 Our crew is working through another phase at Royal Bay, laying in services across the site, hydro, utilities, and everything in between. With multiple runs feeding in from different directions, the focus is on precision, mapping each line, setting correct depths, and keeping everything aligned before final tie-ins.
26 4
10 days ago
Dialing in the Details ✅ One of our crews is on site at Royal Bay, focusing on proper alignment and depths as services are laid in, hydro and more. With multiple lines coming in from different directions, it’s all about staying organized, tracking where everything runs and locking in the right depths before tying it all together.
34 4
11 days ago
Royal Bay | Layering in Services One of our crews is on site at Royal Bay, working through the installation of services for each home as they tie into the mainline along the roadway. From dialing in the proper grades to compacting materials at every stage, it’s all about building it right the first time and keeping everything moving efficiently as the community takes shape.
40 4
12 days ago
Cook Street Upgrade | Roadworks We’ve partnered with @islandasphaltgroup to handle both the milling and paving along the Cook Street upgrade. The first phase is already underway, with crews milling out the existing roadway to reset the surface and prep it properly for new asphalt. Paving began this week on this important corridor. Having one team take it from tear-out to final surface keeps things tight, efficient, and built for the long run
26 4
18 days ago