Tricky split level hanger detail from a recent frame. Had to install the one hangers on the point load while framing the wall. Then slide the other hangers onto the triple lvl stairwell beam. Then we had to grind the weld off the double lvl beam to get it installed. Welders came back to re weld after. Anyone else dislike split levels on the top floor?
A few shots from the recently completed structural frame in mid town Toronto. Made great progress considering it was winter. We had a great crew on this one, looking forward to seeing it finished.
Suspended slab and concrete beam from just before Christmas. Lots of detail and planning went into this one. 20m rebar @8 ” o/c , radius corners, IFC brick ledge. 12x20 garage with a car lift and motorcycle lift
@duffyandassociates
One year in Toronto. Moving across the country has its ups and downs. I really miss my construction friends from Vancouver but have met some great people here. And have learned some new things along the way. Here are my favourite photos from the last year