With the installation of the electrolyzer, a major milestone has been achieved in the green hydrogen production project developed by Polytec Energy. This component represents the key enabling technology for green hydrogen production, allowing sustainable energy conversion within the plant. #PolytecEnergy #idrogenoverde #greenhydrogen #PNRR
102 1
13 days ago
19 0
15 days ago
We are sharing a key milestone at the Polytec Energy plant as part of the H2_Polytec project, focused on green hydrogen production:the installation of 2 storage tanks (25 m³ – 30 bar each) The project has been selected among the winners of a call promoted by the Provincia Autonoma di Trento for the development of green hydrogen plants in decommissioned industrial areas, under Mission 2 “Green Revolution and Ecological Transition” of the Piano Nazionale di Ripresa e Resilienza. #PolytecEnergy #idrogenoverde #greenhydrogen #PNRR
55 0
20 days ago
✨ Prosegue la collaborazione tra Polytec e ITS Machina Lonati nell’ambito della formazione sulla robotica industriale applicata ai processi metallurgici. Un percorso, attivato ogni due anni, che mette in connessione competenze tecniche e mondo industriale, contribuendo a preparare le nuove generazioni alle sfide concrete del lavoro. Un sentito ringraziamento alla Direzione scolastica, agli sponsor e ai docenti che nella crescita dei giovani, favorendo lo sviluppo di professionalità sempre più qualificate e consapevoli. #itsacademymachinalonati #partnership
44 0
26 days ago
Ci sono cantieri che, più di altri, raccontano bene cosa significa trasformare la transizione energetica in infrastruttura reale. A Broni, Nyox è impegnata nella realizzazione di un impianto fotovoltaico da 10,4 MW, commissionato da Neoen, uno dei principali operatori indipendenti a livello internazionale nel settore delle energie rinnovabili. Un progetto che colpisce non solo per la dimensione, ma anche per la qualità del sito e per l’inserimento nel contesto territoriale. Il cantiere sta avanzando secondo programma e, una volta a regime, l’impianto rappresenterà un contributo significativo alla transizione energetica italiana. La producibilità annua stimata si attesterà intorno a 11,5 milioni di kWh, energia rinnovabile in grado di ridurre in modo concreto le emissioni climalteranti e di rafforzare la capacità produttiva nazionale da fonte solare. Progetti di questa scala dimostrano come il fotovoltaico sia ormai una tecnologia matura, affidabile e pienamente integrabile nei grandi sistemi energetici. Ma mostrano anche quanto sia centrale il ruolo dell’EPC nella gestione di siti complessi, nella qualità esecutiva e nel rispetto delle tempistiche. Broni non è solo un impianto superiore ai 10 MW. È un altro tassello di infrastruttura energetica che prende forma, contribuendo a costruire un sistema più sostenibile, resiliente e orientato al futuro.
30 0
27 days ago
Tre siti. Un’unica strategia energetica. Marcegaglia rappresenta da sempre un riferimento per l’industria manifatturiera italiana: scala, competitività internazionale, diversificazione e attenzione crescente alla sostenibilità della filiera produttiva. In questo contesto, Nyox è orgogliosa di aver completato la realizzazione di tre impianti fotovoltaici a terra per Marcegaglia, distribuiti tra Emilia-Romagna e Friuli Venezia Giulia, che letti insieme raccontano molto più di tre singoli progetti. I numeri chiave del sistema: 5,59 MWp di potenza complessiva installata Oltre 6 milioni di kWh/anno di produzione stimata Più di 2.000 tonnellate di CO₂ evitate ogni anno Sono progetti come questi, con la loro articolazione e diffusione, che mostrano cosa succede quando la transizione energetica smette di essere un obiettivo astratto e diventa infrastruttura reale, capace di rafforzare competitività, resilienza e sicurezza energetica dell’industria. Nell’articolo completo entriamo nel dettaglio dei tre impianti, dei numeri sito per sito e del ruolo dell’EPC nella trasformazione energetica dei grandi player industriali.
15 0
1 month ago
Within the Polytec technical support contract, emergency on-site service is designed to handle the most critical situations with speed and expertise. Our team is ready to intervene directly at the customer’s facility or on-site, ensuring a qualified presence exactly when it matters most. This hands-on support helps address issues effectively, reduce downtime, and maintain operational continuity. #Polytec #Service CustomerSupport
16 0
1 month ago
Our monthly recap on bmgroup.com is featuring the latest updates and achievements from our teams. #BMGroup #MonthlyRecap #InspiringInnovation
8 0
1 month ago
Polytec was pleased to host its trusted partner @rhimagnesita for a two-day team working session focused on strengthening collaboration and shared expertise. During these productive days, our global multi function as well as managerial teams worked side by side to review current opportunities and explore new solutions under development. It was a valuable moment to align visions, exchange knowledge, and reinforce our joint commitment to innovation. A key focus of the meeting was the development of advanced solutions aimed at improving operator safety within steelmaking plants, an area where reliability, efficiency, and protection are essential. By combining our know-how and experience, we continue to deliver forward-thinking solutions that meet the evolving needs of the steel industry. #Polytec #RHIMagnesita #Partnership #Innovation #Teamwork #SafetyFirst #SteelIndustry
38 1
1 month ago
EP. 14 - Designing new turbines for existing hydropower plants requires careful engineering work and strong coordination between the different disciplines involved. In this insight, Cristian Vanzin from Hydroalp explains the engineering activities behind the development of new turbines designed to be integrated into already operating plants. Each project involves detailed analyses, geometric adaptations and tailored technical solutions to ensure that the new unit fits perfectly within the existing structures and hydraulic conditions of the plant. In this process, close collaboration with the teams responsible for civil works is essential to coordinate layouts, interfaces and construction solutions. #hydroalp #energiarinnovabile
4 0
1 month ago
📢 Stadio Bettega Vibes 📢 ⚡️Le emozioni del derby Condinese - Pieve di Bono 🐥I pulcini del @pooldelchiese hanno partecipato all’ingresso in campo dell due squadre, un’esperienza emozionante per tutti i ragazzi 🤩 ⚽️ Il match è stato deciso dal gol di Federico Lorenzi su Assist di Manuel Grassi #forzacanarini 🟡🔵
238 0
1 month ago
The H2_Polytec project is a strong example of how the energy transition can also contribute to territorial regeneration. Among the planned activities is the redevelopment of a former quarry, which will be transformed into a photovoltaic plant, giving new purpose to an unused industrial site. The initiative is part of Mission 2, “Green Revolution and Ecological Transition,” of Italy’s National Recovery and Resilience Plan (PNRR), and includes the installation of 5 MW of photovoltaic systems, both rooftop and ground-mounted, to supply renewable electricity to the green hydrogen production facility.A project that combines renewable energy, brownfield redevelopment and innovation, showing how sustainability can also become a concrete opportunity for land regeneration. #PolytecEnergy #idrogenoverde #greenhydrogen #PNRR
13 0
1 month ago