First board form wall on ground floor in Toorak poured and stripped.
Came out flawless, thanks to the help of our brothers in arms @peri_australianz@pronto_concrete@getpumpedcp
#concrete #formwork #formworklife #architecture #apexformwork
Last clean up and final check list done today for team @gradcon in Flinders today before Monday’s pour.
#gradconspec #formwork #suspendedslab #architecture #apexformwork
Level 1 in Kew ready for handover to team @conccreate
Shoutout to @masterform_systems for their speedy service as always
#concrete #formwork #suspendedslab #construction #apexformwork
Great day today in Toorak starting the first of our boardform walls on ground floor.
Big shoutout to our friends at @peri_australianz for all their help in design and supporting us all the way.
#concrete #formwork #formworklife #apexformwork #architecture
Great start to the week in Kew for the boys @conccreate with Level 1 kicking off at full steam ahead as we have a tight schedule on this one.
Let’s gooooo……
#concrete #formwork #construction #suspendedslab #apexformwork
Another suspended slab built flawlessly by our own @joshakaruru - big sexy!
This one in Flinders is now ready for the heavyweights of team @gradcon to do what only they can.
#formwork #gradconspec #concretehomes #formworklife #apexformwork
The final chapter in Highgate Hill for team apex was completed this week, with the spiral stairs stripped and ready for tile.
Without doubt this house will be one of the most spectacular in the area.
Can’t wait to come back and see the finished results once @wendyhollandinteriors has worked her magic.
#concrete #stairs #architecture #interiordesign #toorak
Ground floor pour underway in Kew with @conccreate leading the charge in what is a very hungry little slab.
Team Apex back tomorrow to start columns to Level 1.
#concrete #formwork #suspendedslab #construction #apexformwork
Very big shoutout to our friends @cnccut.melbourne for their help in some very challenging curves in Toorak.
The cost and time savings are invaluable.
#formwork #cnc #concrete #offformconcrete #apexformwork
That’s the first of many board form feature walls completed in Toorak.
Next move ground floor suspended slab.
Then walls, walls and more walls!🫣
Happy Easter to all our comrades who have made this job (and all our jobs) run as smoothly as it has.
#formwork #concrete #apexformwork
First day decking in Kew for team @conccreate .
Apex boys came out of the stalls hot on this one 💪
#concrete #formwork #doka #suspendedslab #posttension #apexformwork