CABA – Monthly Update
Construction at CABA continues to power ahead, with major structural milestones reached and the project now visibly rising from the ground.
The podium slab is complete, creating a clear separation between the basement and ground floor. With formwork stripped, the full scale of CABA’s oversized basement is now on show, including generous car spaces, private storage areas, and a dedicated surfboard store designed for beachside living.
On the ground floor, blockwork is complete and the wellness precinct is taking shape. The gym, heated pool, cold plunge, in-ground spa, sauna, and adjoining showers are now clearly defined, delivering a preview of the premium lifestyle amenities that set CABA apart.
Above, podium-level feature columns and the lift shaft are prepped for the next concrete pours, while Level 1 formwork is well advanced with the first slab pour due in the coming fortnight. Early views from this level already reveal the exceptional ocean outlook CABA will offer its future residents.
With strong site coordination, minimal weather impacts, and construction momentum building, vertical progress is accelerating. Hear directly from Alroe’s Construction Manager Mick Lynch in this month’s video update.