2 months ago
Project LAKESIDE SERENITY 4212 | Stepping into the next phase.
With the crane installed, Lakeside Serenity moves into full structural progression. The site has been excavated to the required basement level, with foundations now underway — setting a solid base for the build to advance across the entire site.
Project: @lakeside_serenity4212
Developer: @keylin_tm
& Kinstone Group
Builder: @costructbuilders
Video: @vsnz.au
#constructionlife #newbuild #bluecollar #developer #goldcoast
42
0